Colony Construction

Mining

40+

Years in Business

700+

Projects Completed

3

Canadian Offices

Colony Construction is a trusted mining construction company in Canada, delivering steel process facilities, mill buildings, camps, and heavy industrial structures for mines across British Columbia, the Yukon, Nunavut, Northwest Territories, and internationally. With four decades of experience in remote, cold-weather, and high-altitude environments, we fabricate, deliver, and erect the steel that keeps mines producing.

Discuss Your Project

Mining Construction Expertise

Since 1985, Colony Construction has completed more than 700 projects, and mining has been at the core of our portfolio from the start. Our steel has gone up at gold, copper, silver, diamond, and polymetallic operations – from the BC Interior to the Yukon, from Alberta’s oil sands to Peru’s Andes and Russia’s Far East. We understand that mining projects live or die on schedule, and that every day of delay on a process plant, mill, or crusher building pushes first-pour or first-production further out.

Colony Construction at a mining site

We have supplied mill buildings, truck shops, warehouses, conveyor galleries, crusher houses, thickener tanks, and camp accommodations for some of the most demanding mines in North and South America. Our work spans Pretium Resources’ Brucejack Gold Mine in northwest BC, the Diavik Diamond Mines in the Northwest Territories, Newmont’s Red Chris copper-gold mine, Teck’s Highland Valley Copper operations, Antamina in Peru, and the Kupol gold project in Russia’s Chukotka region.

Our engineering, detailing, fabrication, and erection teams coordinate directly with mine owners, EPCMs, and general contractors. We routinely work to mining-industry standards including CSA S16, CSA W59, CISC Code of Standard Practice, and site-specific seismic and wind criteria. Whether the project is a greenfield build or a mantle rebuild inside an operating facility, Colony brings the capacity, the people, and the logistics network to deliver.

Our Services for Mining

Challenges We Solve for Mining Clients

Remote Site Access

Many Canadian mines are accessible only by ice road, barge, or fly-in. Colony plans fabrication, packaging, and shipping around narrow delivery windows, pre-assembling sub-modules where possible so that field labour is minimized and critical steel lands on site before the window closes.

Extreme Weather and Arctic Conditions

Our steel is detailed and specified for temperatures that routinely reach -40 C, with appropriate CVN notch toughness, cold-weather welding procedures, and connection details that accommodate thermal movement. Erection crews are experienced in heated enclosures, glycol preheat, and winter work practices required on northern mining sites.

Environmental Compliance

Mining sites operate under strict provincial, territorial, and federal environmental permits. Colony integrates spill containment, secondary containment framing, and compliant cladding systems into the structure, and our project management tracks documentation required by owners and regulators.

Tight Production Schedules

On operating mines, a shutdown may last two to six weeks – and everything must be ready. We pre-fabricate, pre-paint, and pre-assemble as much as possible in our shops so that site work during a turnaround is measured in hours, not weeks. Our Teck HVC mantle rebuild work is built around this discipline.

Heavy Haul Logistics

Mill buildings and crusher structures involve over-dimensional and overweight loads. Colony coordinates pilot cars, permits, bridge crossings, and routing through our logistics partners, sequencing deliveries so erection crews have the right piece at the right time.

Seismic and Wind Design

Mines in BC’s seismic zones and the high-wind coastal territories demand rigorous lateral system design. Our engineering and detailing team works in SDS/2 and Tekla, producing connection designs that satisfy the governing site-specific hazard while still being economical to fabricate.

Mining Projects

Brucejack Gold Mine

Brucejack Gold Mine

Colony fabricated and erected steel for Pretium Resources’ Brucejack Gold Mine in northwest BC, a high-grade underground gold operation in rugged alpine terrain. The project required cold-weather erection and helicopter-supported logistics for remote components.

Diavik Diamond Mines

Diavik Diamond Mines

At Diavik, in the Northwest Territories, Colony supplied structural steel for facilities serving one of Canada’s most remote diamond operations. Steel was delivered over the Tibbitt-to-Contwoyto winter road, requiring careful sequencing with the narrow ice-road season.

Antamina Copper Mine

Antamina Copper Mine

Colony fabricated and shipped steel to Antamina in the Peruvian Andes, one of the largest copper-zinc mines in the world. The project showcased our ability to work across international jurisdictions, coordinating export documentation, ocean freight, and high-altitude erection.

Kupol Gold Mine

Kupol Gold Mine

For the Kupol gold project in Russia’s Chukotka region, Colony delivered structural steel to one of the coldest, most remote operating mines on the planet. The work required Arctic-grade steel specifications and winter-road logistics to remote barging ports.

Newmont Red Chris Mine

Newmont Red Chris Mine

Colony supported the Red Chris copper-gold mine in northwest BC with structural steel for process and support facilities. The site’s remote location and seismic environment demanded disciplined detailing and cold-weather erection planning.

Teck HVC Mantle Rebuild Facility

Teck HVC Mantle Rebuild Facility

At Teck’s Highland Valley Copper, Colony fabricated a mantle rebuild facility engineered around the massive crusher components serviced inside. The work required close coordination with mine operations to minimize impact on production.

Where We Build for Mining

Colony’s fabrication shops ship mining steel across Canada and internationally. We have active project experience in every major Canadian mining jurisdiction and maintain the logistics relationships required to move steel into the Arctic, across ocean freight, and into international mining districts.

Frequently Asked Questions – Mining Construction

What types of mining buildings does Colony Construction build?

Colony fabricates and erects mill buildings, crusher houses, conveyor galleries, truck shops, warehouses, core shacks, headframes, SAG and ball mill pedestals, mantle rebuild facilities, and remote camps. We work at gold, copper, silver, diamond, and polymetallic operations across Canada and internationally.

Can Colony deliver structural steel to remote northern mine sites?

Yes. We routinely ship steel over ice roads, by barge, and by long-haul truck to Yukon, NWT, and Nunavut mines. Our logistics team sequences fabrication around seasonal delivery windows and pre-assembles components where possible to reduce field work.

How does Colony handle cold-weather steel specifications?

Mining steel for northern Canada is specified with appropriate Charpy V-notch toughness and cold-weather welding procedures. Our detailing and QC teams confirm material traceability and weld procedure qualifications so the structure performs at -40 C and below.

Does Colony work on brownfield expansions inside operating mines?

Absolutely. Many of our mining projects involve expansions, rebuilds, or equipment replacements inside operating facilities. We coordinate closely with mine operations to plan work around shutdowns, minimize production impact, and meet tight turnaround schedules.

Can Colony provide design-build for mining projects?

Yes. Our design-build service is frequently used on mining projects where schedule compression matters. We overlap engineering, detailing, fabrication, and erection under a single contract, and our in-house engineering coordinates directly with owner and EPCM teams.

Has Colony built steel for international mines?

Yes. We have delivered structural steel to Antamina in Peru and Kupol in Russia, among other international mining projects. We manage export documentation, ocean freight, and in-country coordination through established partners.

What codes and standards does Colony design to for mining projects?

We work to CSA S16 for structural steel, CSA W59 for welding, and the CISC Code of Standard Practice, plus site-specific seismic, wind, and snow loads from the National Building Code and provincial amendments. International projects are delivered to the governing jurisdiction’s codes.

How quickly can Colony mobilize for a mining project?

Lead times depend on scope, but Colony’s in-house engineering and multi-shop fabrication footprint allow us to compress schedules significantly when required. For urgent shutdown work we have mobilized erection crews within days of award.

Start Your Mining Construction Project

Send us your scope, schedule, and site details. A Colony estimator will review your project and reply within one business day.

Completed Projects:

  • Antamina Peru Mine - Filter Bldg & Concentrate Storage - BHP, Glencore & Teck Resources
  • Brucejack Mine - Mill Building - Pretivm Exploration Inc.
  • Diavik Diamond Mine NWT - Truckshop, Crusher & Ancillary Bldgs - Rio Tinto
  • Kupol Mine Russia - Truckshop, Mill, Crusher & Ancillary Bldgs - Highland Gold
  • Highland Valley Copper - Mantle Rebuild Facility - Teck Resources
  • Fort Mac Mildred Lake Mine Replacement (MLMR) - Syncrude
  • Morenci Arizona Mine - Settler Tank Covers - Fluor
  • Red Chris Mine - Concentrate Storage Shed - Newmont Gold
  • Red Chris Mine - Process Building - Newmont Gold
  • Vale Inco Long Harbour Nfld - Nickel Facility - Vale Limited
  • La Coipa Mine Chile - Truck Shop - Kinross Gold
  • Zaldivar Mine Chile - Truck Shop & Support Facilities - Barrick Mining
  • Elkview Mine Truck & Tire Pad Shop Facility - Teck Resources / Glencore
  • Royal Oaks Mine Buildings - Kemess Mines Inc.
  • Imperial Metals – Mount Polley Project - Imperial Metals
  • Premier Gold Ancillary Buildings - Westmin Resources
  • Conveyors and Transfer Towers - Winterization Project - Gahcho Kué Mine
  • Coalspur Permanent Office Building - Coalspur Mines Ltd.
  • Crusher Building - Cheni Gold Mines Inc.
  • Red Lake Gold Mine - Mercury Abatement Project - Goldcorp Inc.
  • New Afton TAT Process Facility - SUPPLY - New Gold Inc.
  • Brucejack Architectural Finishes - Pretivm Resources Inc.
  • Concentrate Shed - Stewart Bulk Terminals
  • Ekati Diamond Mines - Structural Steel Replacement - Dominion Diamond Mines
  • New Afton TAT Process Facility - INSTALL - New Gold Inc.
  • Eskay Creek Mine - Mill Building - Skeena Resources Ltd
  • Brucejack Crane Upgrade Engineering - Pretivm Resources Inc.
  • Keno Hill Mine - Maintenance Shop Design - Hecla Mining
  • Red Lake Gold Mine - Mercury Abatement Project - Goldcorp Inc.
  • Brucejack Surge Bin Installation - Pretivm Resources Inc.
  • Deeno - New Gutter - Component Orders
  • North American Palladium - Agra Simons Ltd
  • North American Palladium Building Shell - North American Palladium Ltd.
  • Kemess Mine Dry Building - Centerra Gold Inc.
  • Truck Shop Addition - North American Palladium Ltd.
  • N.A. Palladium Pebble Crusher Insulation - Agra Simons Ltd
  • Paste/Backfill Plant - Amec Foster Wheeler
  • Williams Mine Interior Steel - Amec Foster Wheeler
  • Red Lake Mine Cementation Skanska - Newmont Goldcorp Canada
  • Crusher/Paste Backfill Plant - Rio Tinto Diavik Diamond Mine
  • Paste Backfill Chute Work, Dump Hopper and Grizzly - Rio Tinto Diavik Diamond Mine
  • Truck Shop Addition, Two Added Bays - Rio Tinto Diavik Diamond Mine
  • Paste Backfill Plant Chute Work - Rio Tinto Diavik Diamond Mine
  • Mantle Rebuild Building - Teck Highland Valley Copper
  • Vale Inco Long Harbour Nickel/Cobalt Processing Plant - Fluor Canada Ltd. - Vancouver
  • Red Chris Process Plant - Imperial Metals Corp.
  • Mildred Lake Mine Replacement - Kiewit Corp. - Edmonton
  • Red Chris Reagent Building - Imperial Metals Corp.
  • Red Chris Concentrate Storage Shed - Imperial Metals Corp.
  • Red Lake Mercury Abatement - Newmont Goldcorp Canada
  • Brucejack Mine Mill Building - Pretivm Resources Inc.
  • Brucejack Architectural Finishes - Pretivm Resources Inc.
  • Coalspur Permanent Office Building - Coalspur Mines Ltd.
  • Gahcho Kue Exterior Equipment Enclosures - De Beers Group - Yellowknife
  • SBT Con Shed Cladding - Progressive Ventures Ltd.
  • Ekati Diamond Mines - Structural Steel Replacement - Dominion Diamond Mines
  • New Afton TAT Process Facility - New Gold - New Afton Mine
  • Elkview (EVO) Harmer Tire Pad Bldg - Teck Resources Ltd.
  • Brucejack Crane Upgrade Engineering - Pretivm Resources Inc.
  • Maintenance Shop Design - Hecla Keno Hill Silver Mine
  • Westmin Mines Ltd. - S. Jensen Construction
  • Cheni Cold Mines - Cheni Gold Mines
  • Premier Gold Project - Westmin Mines Ltd.
  • Golden Bear Mine
  • Assay Lab - Cheni Gold Mines - CMC Engineering Group Ltd.
  • Crusher Building Cladding - Cheni Gold Mines - Commonwealth Pacific Consultats Ltd.
  • Extra Work - Cheni Gold Mines - Cheni Gold Mines
  • Electrical Shed for Premier Gold Project - Westmin Mines Ltd.
  • Quintette Shop Building - Teck Resources Limited
  • Eskay Creek Mine - Skeena Resources Ltd
  • Tritan Mining
  • Kemess South Project Pumphouses - Centerra Gold Inc.
  • Kemess South Project Primary Crusher / OH Crane Erector - Centerra Gold Inc.
  • Red Lake Mine Project - Newmont Goldcorp Canada