Our Project

Meg Energy Phase 2

Client: MEG Energy Corp.

Project Size: 60,000 SF | 5,500 SM

Location: Christina Lake, Alberta, Canada

Scope of Project: Gas Turbine Building, Steam Generation Plant, Water Treatment Plant, Warehouse and Corridor: pre engineered steel buildings, walls and roof, firewalls, crane beams, floor steel, equipment platforms, HVAC components and controls, installation of these items.

We re-engineered these buildings utilizing a hybrid pre-engineered/conventional steel design which allowed the engineers design the process to have more flexibility. There were also numerous loads to be supported by our steel including pipe racks, cable trays, equipment platforms, overhead bridge cranes (50 tonne x 90’-0” span in Gas Turbine Building), etc.