Colony Construction builds mills, truck shops, conveyor structures, and dry/change facilities for US hard-rock and metals mining – from Nevada gold-district operators and Utah copper producers to Colorado molybdenum, Montana copper, Wyoming trona, and Alaska remote sites. Founded in 1985 and responsible for more than 700 completed projects, Colony brings 40+ years of heavy mining experience to US owners. Every frame is engineered to AISC 360-22, welded to AWS D1.1:2020, stamped by licensed US PEs, and executed to MSHA Title 30 CFR Parts 56 (surface) and 57 (underground) on active sites plus OSHA 29 CFR 1926 for non-mine-face construction. Clients keep returning because Colony treats a mill-rebuild shutdown the same way they do – by the hour, not by the week.

Discuss Your Project

US Mining Construction Expertise

Mining construction lives or dies on schedule. A mill-rebuild overhaul on a producing Nevada gold operation or a Utah copper crusher house is measured in hours of production lost, not days of convenience gained. Colony’s mining portfolio spans gold, copper, molybdenum, trona, diamond, and polymetallic operations across western North America, giving our engineers, detailers, fabricators, and erectors pattern-matching experience from the first scoping call. Our steel has gone up at fly-in gold sites, Andean copper concentrators, Arctic diamond operations, and oil-sands-scale process facilities – building types directly applicable to Alaska Donlin and Pebble gold, Nevada gold-district mills, Arizona and Utah copper operations, Colorado Climax-district moly, and the Wyoming trona basin.

Colony Construction mining work

Colony operates fabrication shops in Surrey, Kelowna, and Edmonton, mobilizing US mining projects through our Pacific Northwest logistics corridor into Washington, Alaska, Nevada, Utah, Colorado, Arizona, and the Mountain West. Our engineers design to AISC 360-22 structural and AISC 341 seismic provisions for Nevada and California SDC D/E sites, with CVN notch-toughness specifications for sub-Arctic Alaska service. We routinely fabricate bridge crane runways up to 50 tons, long-span mill envelopes over 150 ft clear, and mantle-rebuild facilities tolerance-coordinated with the mill equipment vendor. Every package arrives as a single-source scope – engineering, fabrication, cladding, and erection – which is why US mining owners keep coming back for their most schedule-critical work.

Challenges We Solve for US Hard-Rock and Metals Operators

MSHA Part 56 / Part 57 Compliance on Active Sites

Any construction work inside an active mine site runs under MSHA Title 30 CFR, not just OSHA. Colony’s site supervisors carry MSHA Part 46 and Part 48 training, coordinate daily workplace examinations under 56.18002 / 57.18002, and integrate owner safety programs into our site orientation before boots hit the ground. The compliance framework is non-negotiable; our job is to make it invisible to the owner’s schedule.

Remote-Site Logistics – Alaska, Nevada, Mountain West

On fly-in Alaska gold projects or remote Nevada exploration sites, every missing part is a week-long problem. Colony pre-assembles sub-modules in our Pacific Northwest shops, ships sequenced kits, and mobilizes dedicated erection crews. We have delivered steel into fly-in sites in northwest BC, the Yukon, NWT, and Arctic diamond operations – logistics experience that transfers directly to Alaska Donlin, Pebble, Red Dog, and Nevada remote fly-in sites.

Mill Tolerances and Mantle Rebuild Sequencing

SAG and ball mill pedestals, crusher houses, and mantle-rebuild facilities live at tighter tolerances than typical structural work. Our detailing team coordinates directly with the mill-equipment vendor in Tekla, our shops fabricate to AISC 303 Code of Standard Practice, and our QC tracks the hold points the mill OEM insists on. On a shutdown window measured in days, that tolerance discipline is the difference between start-up on schedule and a month-long production loss.

Seismic Design Category D and E Sites

Nevada, California, and most of Alaska sit in high-seismic zones; Utah’s Wasatch Front is SDC D. Colony’s mill buildings and truck shops are detailed with AISC 341 seismic provisions where the geometry requires – ductile moment-frame connections, concentrically braced frames, and drift-checked cladding attachments – so the building meets IBC / ASCE 7 SDC D and E demands without being over-designed for the site hazard.

Cold-Weather Specifications for Alaska and Rocky Mountain Sites

Our steel is routinely specified for -40°F service with appropriate Charpy V-notch toughness, winter welding procedures qualified to AWS D1.1:2020, and connection details that accommodate thermal movement. Erection crews are experienced in heated enclosures, glycol preheat, and winter work practices – capabilities that transfer directly from our Yukon and NWT mining work to Alaska Donlin, Pebble, Fort Knox, and Rocky Mountain high-elevation sites.

Integrating with Existing Mill Structures During Expansions

Many US mine projects are brownfield – a concentrator expansion, a crusher-house add-on, or a mill-equipment swap inside an operating facility. Colony integrates new structure into existing framing with laser-surveyed as-built verification, connection details designed around existing member sections, and erection sequencing planned around production. The goal is always the same: deliver the expansion without disrupting the mine that paid for it.

Featured Projects

Brucejack Gold Mine

Brucejack Gold Mine

Colony fabricated and erected steel for this high-grade underground gold operation on a fly-in-only site in rugged alpine terrain. The project required cold-weather erection, helicopter-supported logistics for remote components, and integration with the mill vendor’s tolerance requirements – experience that translates directly to Alaska Donlin, Pebble, and Fort Knox remote gold-mine programs.

Newmont Red Chris Mine

Newmont Red Chris Mine

Structural steel for process and support facilities at a large copper-gold operation in seismic, remote terrain. Disciplined detailing and cold-weather erection planning on a high-seismic, high-snow site – directly applicable to Nevada, Utah, Colorado, and Arizona copper-gold operations.

Antamina Copper Mine

Antamina Copper Mine

Fabricated and shipped steel to one of the largest copper-zinc mines in the world, with high-altitude erection and international-jurisdiction documentation. The heavy copper-mill construction scope is directly applicable to Utah Kennecott, Arizona Morenci-scale copper, and Nevada copper-gold mill work.

Frequently Asked Questions

Which US mine types does Colony build for – hard-rock metals, coal, industrial minerals?

Colony’s core US focus is hard-rock and metals mining – gold, copper, molybdenum, silver, and polymetallic operations in Nevada, Utah, Colorado, Montana, Arizona, and Alaska. We also build for industrial minerals (Wyoming trona, Nevada lithium brine operations) and have Canadian diamond-mine experience that transfers to Alaska remote operations. Thermal coal is outside our current focus; metallurgical coal on a case-by-case basis.

How does Colony handle MSHA Part 56 / Part 57 compliance on active surface and underground sites?

Every Colony site supervisor and erector assigned to an active US mine carries MSHA Part 46 (surface) or Part 48 (underground) training per Title 30 CFR. We integrate owner-specific site orientation, daily workplace examinations under 56.18002 / 57.18002, and ground-control documentation into our site plan before mobilizing. Our QA/QC tracking aligns with the owner’s MSHA-reportable inspection logs.

What about remote Alaska and Nevada fly-in logistics, pre-fabrication, and cold-weather erection?

Colony has delivered structural steel to fly-in and remote sites across northwest BC, the Yukon, NWT, and Arctic diamond operations – pattern-matching experience for Alaska Donlin, Pebble, Red Dog, and Nevada remote gold-district sites. We pre-assemble sub-modules in our Pacific Northwest shops, ship sequenced kits on approved routes, and deploy dedicated erection crews trained for -40°F service and short summer windows.

How do you integrate with existing mill and process-plant structures during a rebuild or expansion?

Laser-surveyed as-built verification of existing framing, Tekla modeling coordinated directly with the mill-equipment vendor, connection details designed around existing member sections, and erection sequencing planned around the owner’s production schedule. On shutdown work we fabricate, pre-assemble, and pre-paint everything that can be completed off-site so field time is measured in hours, not days.

Start Your Mining Construction Project

Send us your scope, schedule, and site details. A Colony estimator will review your project and reply within one business day.

Completed Projects:

  • Antamina Peru Mine - Filter Bldg & Concentrate Storage - BHP, Glencore & Teck Resources
  • Brucejack Mine - Mill Building - Pretivm Exploration Inc.
  • Diavik Diamond Mine NWT - Truckshop, Crusher & Ancillary Bldgs - Rio Tinto
  • Kupol Mine Russia - Truckshop, Mill, Crusher & Ancillary Bldgs - Highland Gold
  • Highland Valley Copper - Mantle Rebuild Facility - Teck Resources
  • Fort Mac Mildred Lake Mine Replacement (MLMR) - Syncrude
  • Morenci Arizona Mine - Settler Tank Covers - Fluor
  • Red Chris Mine - Concentrate Storage Shed - Newmont Gold
  • Red Chris Mine - Process Building - Newmont Gold
  • Vale Inco Long Harbour Nfld - Nickel Facility - Vale Limited
  • La Coipa Mine Chile - Truck Shop - Kinross Gold
  • Zaldivar Mine Chile - Truck Shop & Support Facilities - Barrick Mining
  • Elkview Mine Truck & Tire Pad Shop Facility - Teck Resources / Glencore
  • Royal Oaks Mine Buildings - Kemess Mines Inc.
  • Imperial Metals – Mount Polley Project - Imperial Metals
  • Premier Gold Ancillary Buildings - Westmin Resources
  • Conveyors and Transfer Towers - Winterization Project - Gahcho Kué Mine
  • Coalspur Permanent Office Building - Coalspur Mines Ltd.
  • Crusher Building - Cheni Gold Mines Inc.
  • Red Lake Gold Mine - Mercury Abatement Project - Goldcorp Inc.
  • New Afton TAT Process Facility - SUPPLY - New Gold Inc.
  • Brucejack Architectural Finishes - Pretivm Resources Inc.
  • Concentrate Shed - Stewart Bulk Terminals
  • Ekati Diamond Mines - Structural Steel Replacement - Dominion Diamond Mines
  • New Afton TAT Process Facility - INSTALL - New Gold Inc.
  • Eskay Creek Mine - Mill Building - Skeena Resources Ltd
  • Brucejack Crane Upgrade Engineering - Pretivm Resources Inc.
  • Keno Hill Mine - Maintenance Shop Design - Hecla Mining
  • Red Lake Gold Mine - Mercury Abatement Project - Goldcorp Inc.
  • Brucejack Surge Bin Installation - Pretivm Resources Inc.
  • Deeno - New Gutter - Component Orders
  • North American Palladium - Agra Simons Ltd
  • North American Palladium Building Shell - North American Palladium Ltd.
  • Kemess Mine Dry Building - Centerra Gold Inc.
  • Truck Shop Addition - North American Palladium Ltd.
  • N.A. Palladium Pebble Crusher Insulation - Agra Simons Ltd
  • Paste/Backfill Plant - Amec Foster Wheeler
  • Williams Mine Interior Steel - Amec Foster Wheeler
  • Red Lake Mine Cementation Skanska - Newmont Goldcorp Canada
  • Crusher/Paste Backfill Plant - Rio Tinto Diavik Diamond Mine
  • Paste Backfill Chute Work, Dump Hopper and Grizzly - Rio Tinto Diavik Diamond Mine
  • Truck Shop Addition, Two Added Bays - Rio Tinto Diavik Diamond Mine
  • Paste Backfill Plant Chute Work - Rio Tinto Diavik Diamond Mine
  • Mantle Rebuild Building - Teck Highland Valley Copper
  • Vale Inco Long Harbour Nickel/Cobalt Processing Plant - Fluor Canada Ltd. - Vancouver
  • Red Chris Process Plant - Imperial Metals Corp.
  • Mildred Lake Mine Replacement - Kiewit Corp. - Edmonton
  • Red Chris Reagent Building - Imperial Metals Corp.
  • Red Chris Concentrate Storage Shed - Imperial Metals Corp.
  • Red Lake Mercury Abatement - Newmont Goldcorp Canada
  • Brucejack Mine Mill Building - Pretivm Resources Inc.
  • Brucejack Architectural Finishes - Pretivm Resources Inc.
  • Coalspur Permanent Office Building - Coalspur Mines Ltd.
  • Gahcho Kue Exterior Equipment Enclosures - De Beers Group - Yellowknife
  • SBT Con Shed Cladding - Progressive Ventures Ltd.
  • Ekati Diamond Mines - Structural Steel Replacement - Dominion Diamond Mines
  • New Afton TAT Process Facility - New Gold - New Afton Mine
  • Elkview (EVO) Harmer Tire Pad Bldg - Teck Resources Ltd.
  • Brucejack Crane Upgrade Engineering - Pretivm Resources Inc.
  • Maintenance Shop Design - Hecla Keno Hill Silver Mine
  • Westmin Mines Ltd. - S. Jensen Construction
  • Cheni Cold Mines - Cheni Gold Mines
  • Premier Gold Project - Westmin Mines Ltd.
  • Golden Bear Mine
  • Assay Lab - Cheni Gold Mines - CMC Engineering Group Ltd.
  • Crusher Building Cladding - Cheni Gold Mines - Commonwealth Pacific Consultats Ltd.
  • Extra Work - Cheni Gold Mines - Cheni Gold Mines
  • Electrical Shed for Premier Gold Project - Westmin Mines Ltd.
  • Quintette Shop Building - Teck Resources Limited
  • Eskay Creek Mine - Skeena Resources Ltd
  • Tritan Mining
  • Kemess South Project Pumphouses - Centerra Gold Inc.
  • Kemess South Project Primary Crusher / OH Crane Erector - Centerra Gold Inc.
  • Red Lake Mine Project - Newmont Goldcorp Canada