
New Steel Design Rules Are Reaching Job Sites: What Owners Should Ask Before Building
A new steel design standard now governs projects under the 2024 code cycle, and the transition affects budgets, schedules, and connection details.

A new steel design standard now governs projects under the 2024 code cycle, and the transition affects budgets, schedules, and connection details.

A builder’s guide to what US critical minerals projects require, from site access and ore handling through the processing plant, tailings, and logistics.

A breakdown of what actually drives the cost to build a truck shop in Texas, from steel shell pricing to crane systems, bay layout, and code requirements.

A surge in produced-water pipelines, pump stations, and treatment plants across the Permian is rewriting the schedule, siting, and cost math for industrial facility owners and the contractors who build for them.

A finalized U.S. hydrogen incentive and a compressed 2027 deadline are pushing green steel and heavy industrial projects toward early groundbreaking.

We plan, sequence, and build lithium mines and processing plants across Nevada and the wider United States.